Unterschiede

Hier werden die Unterschiede zwischen zwei Versionen angezeigt.

Link zu dieser Vergleichsansicht

Beide Seiten der vorigen RevisionVorhergehende Überarbeitung
Nächste Überarbeitung
Vorhergehende Überarbeitung
en:berechnungen:kompressionsverhaeltnisse [2025/01/20 17:08] neelesten:berechnungen:kompressionsverhaeltnisse [2025/09/04 10:44] (aktuell) – [Compression ratio] neelest
Zeile 1: Zeile 1:
-====== Compression ratios ======+====== Compression ratio & Pumping ratio ======
  
 In REX, the following ratios are differentiated between different screw zones. In REX, the following ratios are differentiated between different screw zones.
Zeile 5: Zeile 5:
 ===== Compression ratio ===== ===== Compression ratio =====
  
-The following equation applies from (REX >= 18.1 / PSI >= 16.1)\\ +In REX/PSI, compression ratios are calculated both within the respective zones (compression zone and decompression zoneas well as in the overview section under "Dimensions," where the compression ratio of the zones before and after a (de-)compression zone is displayed. \\ 
 +The values may differ if the channel pitch, land width, channel radii, or flank angle are varied.  \\
 ==== (De)compression zones ====  ==== (De)compression zones ==== 
  
Zeile 14: Zeile 14:
  
 With index 1 for the start of the zone and index 2 for the end of the zone. \\ With index 1 for the start of the zone and index 2 for the end of the zone. \\
- 
-===== Volume compression ratio (VCR) ===== 
- 
-As the ratio of the channel depths does not allow a meaningful comparison between two screw concepts, the volume compression ratio is used for a more precise description. It relates the channel cross-section of the feed zone to the channel cross-section of the metering zone. In REX, the screw clearance is also taken into account. \\ 
- 
-$VCR=\frac{[(h_E+s)*(t_E-i_E*e_E)]*(D-(h_E+s))}{[(h_M+s)*(t_M-i_M*e_M)]*(D-(h_M+s))}$ 
- 
-with the channel depth $h$, the side clearance $s$, the pitch $t$, the number of webs $i$, the web width $e$ and the diameter $D$. With the indices $E$ for the feed zone and $M$ for the metering zone. 
  
 ==== Barrier zones ====  ==== Barrier zones ==== 
Zeile 73: Zeile 65:
 ===Further topics=== ===Further topics===
   * [[en:berechnungen:einfache_berechnung|]]   * [[en:berechnungen:einfache_berechnung|]]
 +  * [[en:berechnungen:prozess_iterieren]]
   * [[en:berechnungen:durchsatz|]]   * [[en:berechnungen:durchsatz|]]
   * [[en:berechnungen:druckverlauf|]]   * [[en:berechnungen:druckverlauf|]]
Zeile 78: Zeile 71:
   * [[en:berechnungen:temperaturverlauf|]]   * [[en:berechnungen:temperaturverlauf|]]
   * [[en:berechnungen:leistung_und_schubspannungen|]]   * [[en:berechnungen:leistung_und_schubspannungen|]]
 +  * [[en:berechnungen:schergeschwindigkeit]]
   * [[en:berechnungen:verweilzeit|]]   * [[en:berechnungen:verweilzeit|]]
   * [[en:berechnungen:verweilzeitverteilung|]]   * [[en:berechnungen:verweilzeitverteilung|]]