| ====== Cycle time calculation ====== | ====== Cycle time calculation ====== | ||
| + | -> [[..: | ||
| + | |||
| + | The determination of the cycle time calculation is part of the [[..: | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | Via the drop-down selection, four different options for determining the cycle time are provided. | ||
| + | |||
| + | In general, the following applies: | ||
| + | |||
| + | $$t_{cycle}=t_{plasticizing}+t_{downtime}$$ | ||
| + | |||
| + | The downtime therefore also includes, among others, the injection time and the holding pressure time. Thus, the following condition must hold: | ||
| + | |||
| + | $$t_{downtime} \geq t_{injection} + t_{holding}$$ | ||
| + | |||
| + | ==== Screw speed is calculated, times are specified ==== | ||
| + | In this mode, the three fields must be defined: | ||
| + | * Cycle time | ||
| + | * Plasticizing time | ||
| + | * Downtime | ||
| + | |||
| + | Any two values can be entered; the third is calculated automatically. | ||
| + | From the [[..: | ||
| + | |||
| + | ==== Screw speed is calculated, throughput is specified ==== | ||
| + | In this mode, the two fields must be defined: | ||
| + | * Downtime | ||
| + | * Throughput | ||
| + | |||
| + | From the throughput and the [[..: | ||
| + | |||
| + | ==== Screw speed and cycle time are specified ==== | ||
| + | In this mode, the two fields must be defined: | ||
| + | * Screw speed | ||
| + | * Cycle time | ||
| + | |||
| + | Based on the screw speed, the mass throughput is calculated (this can also be entered directly as an option). From the mass throughput and the [[..: | ||
| + | |||
| + | ==== Screw speed and downtime are specified ==== | ||
| + | In this mode, the two fields must be defined: | ||
| + | * Screw speed | ||
| + | * Downtime | ||
| + | |||
| + | Based on the screw speed, the mass throughput is calculated (this can also be entered directly as an option). From the mass throughput and the | ||
| + | [[..: | ||