Unterschiede
Hier werden die Unterschiede zwischen zwei Versionen angezeigt.
| Beide Seiten der vorigen RevisionVorhergehende ÜberarbeitungNächste Überarbeitung | Vorhergehende Überarbeitung | ||
| en:eingabe_der_verfahrensparameter:eingabe_der_verfahrensparameter [2025/05/14 15:23] – [Melt temperature] cschall | en:eingabe_der_verfahrensparameter:eingabe_der_verfahrensparameter [2025/06/27 13:13] (aktuell) – [Disperse melting at] cschall | ||
|---|---|---|---|
| Zeile 9: | Zeile 9: | ||
| * **Required parameters: | * **Required parameters: | ||
| * **Optional parameters: | * **Optional parameters: | ||
| - | * **PSI only**: Inputs for cycle time calculation | + | * **PSI only**: Inputs for [[..: |
| * **PSI only**: Inputs for calculating the closing time of the non-return valve | * **PSI only**: Inputs for calculating the closing time of the non-return valve | ||
| Zeile 59: | Zeile 59: | ||
| The value therefore has an influence on the throughput calculation, | The value therefore has an influence on the throughput calculation, | ||
| - | ==== Raw material | + | ==== Raw material temperature ==== |
| - | The raw material | + | The raw material temperature corresponds to the temperature at which the plastic is fed into the extruder/ |
| ===== Optional entries ===== | ===== Optional entries ===== | ||
| Zeile 68: | Zeile 68: | ||
| {{ : | {{ : | ||
| - | ==== Location of the melt vortex | + | ==== Location of the melt pool formation ==== |
| - | The location of the melt vortex | + | The location of melt pool formation can be specified |
| - | ==== Disperse melting | + | ==== Disperse melting |
| REX can calculate the [[en: | REX can calculate the [[en: | ||
| - | ==== Throughput (at a specified speed) ==== | ||
| - | If a circumferential speed or a screw speed is specified, a throughput can also be specified here as an option. This skips the throughput calculation and the entered value is used. | + | ==== Start Temperatur |
| - | ====Kennlinienfeld==== | + | |
| - | Clicking on the ‘Characteristic | + | As an additional optional input parameter, the starting temperature can be specified. This temperature corresponds to the temperature of the melt vertex at the location where the melt vertex is formed and represents the temperature at which the [[en: |
| + | ==== Throughput (with given screw speed) ==== | ||
| + | |||
| + | If a peripheral velocity or a screw speed is specified, a throughput can also be specified here as an option. This skips the throughput calculation and the entered value is used. | ||
| + | ====Characteristic field==== | ||
| + | |||
| + | Clicking on the ‘Characteristic field’ button opens a new window. | ||
| {{ : | {{ : | ||
| - | The characteristic | + | The characteristic field calculation can be activated here. Three pressures and three speeds are entered. In a process calculation, |
| ===== Cycle time calculation (PSI) ===== | ===== Cycle time calculation (PSI) ===== | ||
| The cycle time calculation is treated separately | The cycle time calculation is treated separately | ||
| - | * | + | * |
| ===== Inputs for calculating the closing time of the non-return valve ===== | ===== Inputs for calculating the closing time of the non-return valve ===== | ||
| - | The 3 inputs are only used to calculate the closing time of the ring non-return valve. | + | {{ : |
| + | |||
| + | The 3 inputs are only used to calculate the closing time of the non-return valve. | ||
| - | * The injection pressure must be specified. The injection pressure is one of the forces that presses the locking | + | * The injection pressure must be specified. The injection pressure is one of the forces that presses the closing |
| * Holding pressure | * Holding pressure | ||
| * Holding pressure time | * Holding pressure time | ||
| The holding pressure and holding pressure time are not absolutely necessary. They are only required if the locking ring of the ring non-return valve closes after the injection phase and therefore within the holding pressure phase. This is not a sensible operating point. | The holding pressure and holding pressure time are not absolutely necessary. They are only required if the locking ring of the ring non-return valve closes after the injection phase and therefore within the holding pressure phase. This is not a sensible operating point. | ||