Unterschiede
Hier werden die Unterschiede zwischen zwei Versionen angezeigt.
| Beide Seiten der vorigen RevisionVorhergehende ÜberarbeitungNächste Überarbeitung | Vorhergehende Überarbeitung | ||
| en:versuchsplanung_und_variationsmodul:variationsmodul [2024/08/13 16:11] – [Variation module] admin | en:versuchsplanung_und_variationsmodul:variationsmodul [2025/01/20 17:17] (aktuell) – [3. Button bar] neelest | ||
|---|---|---|---|
| Zeile 13: | Zeile 13: | ||
| ===== Variation manager===== | ===== Variation manager===== | ||
| The variation manager can be activated in the main dialogue of REX /PSI via | The variation manager can be activated in the main dialogue of REX /PSI via | ||
| - | * the Vary process button | + | * the //Vary process// button |
| * the menu | * the menu | ||
| - | * double-click on Variations in the Project data window | + | * double-click on //Variations// in the Project data window |
| - | window. | ||
| The variation manager can be used to manage the variations associated with a process, i.e. to create, open and delete them.\\ | The variation manager can be used to manage the variations associated with a process, i.e. to create, open and delete them.\\ | ||
| - | If variations have already been created for the selected process, these are listed in the Variations window. After a simple click on the name of the variation, the associated details are displayed in the Preview window. In addition, the multigraphic can be called up directly for an existing variation (Multigraphic | + | If variations have already been created for the selected process, these are listed in the Variations window. After a simple click on the name of the variation, the associated details are displayed in the Preview window. In addition, the multigraphic can be called up directly for an existing variation (//Multigraphic...// button) or the test plan can be printed (//Print// button). \\ |
| If there are no variations for the process, both windows are empty.\\ | If there are no variations for the process, both windows are empty.\\ | ||
| Zeile 27: | Zeile 26: | ||
| =====Create variation===== | =====Create variation===== | ||
| - | Click on the button with the green plus > Enter the name of the variation > Click on the Open button\\ | + | Click on the button with the green plus > Enter the name of the variation > Click on the //Open// button\\ |
| =====Open variation===== | =====Open variation===== | ||
| - | Double-click on the name of the variation in the Variations window or single-click on the name of the variation in the Variations window > Click on the Edit button \\ | + | Double-click on the name of the variation in the Variations window or single-click on the name of the variation in the Variations window > Click on the //Edit// button \\ |
| =====Remove variation===== | =====Remove variation===== | ||
| - | Single-click on the name of the variation in the Variations window >Click on the button with the red minus sign\\ | + | Single-click on the name of the variation in the Variations window > Click on the button with the red minus sign\\ |
| =====Variation module===== | =====Variation module===== | ||
| The main dialogue of the variation module can be divided into three areas: \\ | The main dialogue of the variation module can be divided into three areas: \\ | ||
| - | |||
| - | {{ : | ||
| * Dialogue window for selecting control and target variables | * Dialogue window for selecting control and target variables | ||
| * Experiment plan | * Experiment plan | ||
| * Button bar for selecting actions | * Button bar for selecting actions | ||
| + | |||
| + | {{ : | ||
| ====1. Dialogue window for selecting control and target variables ==== | ====1. Dialogue window for selecting control and target variables ==== | ||
| Zeile 55: | Zeile 54: | ||
| Furthermore, | Furthermore, | ||
| - | ===Öffnen eines Ordners | + | ===Opening a folder |
| - | Doppelklick auf den Namen des Ordners | + | Double-click on the name of the folder |
| - | ===Öffnen des Konfigurationsdialoges einer Steuergröße/Zielgröße | + | ===Opening the configuration dialog of a control variable/target variable |
| - | Double-click on the control value/ | + | Double-click on the control value/ |
| - | or ‘Add’ button. \\ | + | or //Add// button. \\ |
| Zeile 94: | Zeile 93: | ||
| Delete a column or a control or target variable from the test plan. \\ | Delete a column or a control or target variable from the test plan. \\ | ||
| - | Click in any field of the column > Click on the ‘Delete column’ button.\\ | + | Click in any field of the column > Click on the //Delete column// button.\\ |
| ===Duplicate experiment=== | ===Duplicate experiment=== | ||
| Duplicate an existing experiment or line in the experiment plan.\\ | Duplicate an existing experiment or line in the experiment plan.\\ | ||
| - | Click in any field of the experiment/ | + | Click in any field of the experiment/ |
| ===Delete experiment=== | ===Delete experiment=== | ||
| Delete an experiment or a line of the experiment plan.\\ | Delete an experiment or a line of the experiment plan.\\ | ||
| - | Click in any field of the experiment/ | + | Click in any field of the experiment/ |
| ===Check all trials=== | ===Check all trials=== | ||
| Zeile 118: | Zeile 117: | ||
| An independent process can be created from each of the tests shown in the test plan. The individual process components are saved in separate files for this purpose. \\ | An independent process can be created from each of the tests shown in the test plan. The individual process components are saved in separate files for this purpose. \\ | ||
| - | A trial is selected by clicking on the corresponding line in the trial plan. The dialogue for saving the individual process components is opened by clicking on the button Create process for selected trial. | + | A trial is selected by clicking on the corresponding line in the trial plan. The dialogue for saving the individual process components is opened by clicking on the button |
| + | |||
| + | ===== Calculate the variations ===== | ||
| + | |||
| + | The ‘// | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | Furthermore, | ||
| + | |||
| + | When returning to the variation manager (see Creating a new variation / Opening an existing variation), all processes can be compared with each other in detail using the ‘// | ||
| ===Further topics=== | ===Further topics=== | ||